Mon–Sat 7AM–6PM  ·  (612) 516-0263

Burnsville & the Twin Cities West Metro

Butkov Remodeling

Whole-Home Remodeling in Shorewood

The lot is the reason you are here. The floor plan is the reason you are calling.
House interior during renovation with framing exposed

Shorewood has the thing you cannot build: large wooded lots, mature canopy, quiet streets, and proximity to the lake without being on top of it.

What it also has is a lot of houses built between the late 1960s and the mid 1980s, laid out for a way of living that has since changed. Formal rooms at the front, a kitchen closed off from everything, bedrooms sized to the standards of the day, and a main floor divided into more rooms than anybody now wants.

We take on whole-home remodeling across Shorewood: opening main floors, rebuilding kitchens, reworking bedroom and bathroom counts, finishing and expanding lower levels, and bringing wiring, insulation and mechanicals up to standard while the walls are open.

Finished interior after a full house renovation with new flooring and trim

The Shorewood houses we remodel

The advantage of remodeling in Shorewood over most of the metro is that these houses were built with room to work.

Lot sizes here mean that where an addition is genuinely the right answer, there is usually space for one without fighting setbacks the way a smaller-lot suburb does. That widens the options rather than narrowing them, which is why the first conversation should be about whether you need more house or a better-arranged one. In our experience it is the second more often than people expect.

The houses themselves are generally well built and structurally sound, so most of the budget goes into layout, finishes and mechanicals rather than repair. The recurring work is the same three or four moves: taking down the wall between kitchen and dining, reworking the primary suite into something with a real bathroom and closet, converting a formal room nobody uses into space the family lives in, and dealing with a lower level that was framed but never properly finished.

One caution specific to wooded lots. Mature trees close to the house are a large part of what the property is worth, and what kills them is soil compaction and root damage during construction rather than anything obvious. Access and staging get planned around the root zones before equipment arrives.

Licensed • Bonded • Insured • Serving the Twin Cities

Butkov Remodeling — Your Home Deserves Better Than Average

Big wooded lots, generous houses, and floor plans built for 1978. Our Shorewood whole-home remodeling opens the main floor and reworks the plan. Priced in writing before demolition.

Get in Touch with Our Team

Whole-home remodeling in Shorewood: the neighborhoods we cover

Shorewood, MN
Tree-lined residential street in Shorewood, Minnesota
We work throughout Shorewood, including the neighborhoods off Smithtown Road, Eureka Road and Mill Street, the properties toward Gideons Bay and St. Albans Bay, the wooded streets running between Excelsior and Chanhassen, and the corridors along Highway 7 and County Road 19. Lots here are larger and more varied than in a platted suburb, so grade, tree cover and septic status get assessed on site rather than assumed.

Common Questions

Do we need an addition or can the house we have be rearranged?+
Start with the second question, because the answer is yes more often than people expect. Houses of this era were divided into more rooms than a family now wants, and removing two or three walls frequently produces more usable space than adding four hundred square feet would. An addition costs excavation, footings, foundation, roof and exterior before you get a finished room. Reallocating costs framing and finishes. We price both honestly and tell you which one your complaint actually calls for.
Can the wall between the kitchen and dining room come out?+
Almost always, and it is the single most requested change we see here. It is usually load-bearing, which is an engineering question rather than an obstacle: we size a beam for the load, carry it down through the framing to a bearing point at the foundation, and the wall is gone. What takes the planning is what lives inside that wall — ductwork, plumbing stacks and electrical all need somewhere else to go, and rerouting them is often a bigger line item than the beam itself.
Is it worth updating the mechanicals while we are at it?+
On a house of this age, generally yes, and doing it during a whole-home project is the cheapest it will ever be. Panels sized for a 1970s house struggle with modern kitchen loads, wall insulation is frequently thin or absent by current standards, and ductwork extended over decades rarely reaches the far end of the house properly. All of it is straightforward while the walls are open and disruptive afterwards. We will separate what genuinely needs doing from what can wait.
We have mature oaks close to the house. Does that limit the work?+
It limits how rather than what. The root zone of a mature tree extends well beyond its canopy, and the damage that kills them is compaction from equipment and trenching through roots, not a trimmed branch. Where work touches the exterior on that side, we plan access and staging away from the root zone, hand-dig anywhere a trench must cross it, and fence the protection area before anything arrives. On a Shorewood lot those trees are a meaningful share of the property value.
Are Shorewood properties on city sewer or septic?+
It varies by location, and it matters if the project changes bedroom count, because a Minnesota septic system is sized by bedrooms rather than by people. Where a property is on a private system, adding a bedroom can exceed what the drainfield was permitted for. We establish which you are on and pull the compliance record before designing anything that adds a bedroom, rather than discovering it at permit stage.
How long does a whole-home project here take?+
Several months from demolition to final walkthrough for a genuine whole-home scope, and longer where structural or mechanical work is involved. The honest variable is not our schedule, it is how much is found once the walls are open, which is why we open key areas before finalising the price rather than after. You get the realistic range at the estimate and the specific weeks that will be most disruptive before you commit.

Walk us through which rooms fail you and how the family actually uses the main floor. That conversation usually settles the addition question before any drawing happens, and it is the cheapest hour of the whole project.

John will walk the space with you. You get a written scope and a fixed price before demolition starts, not a range that moves once the wall is open. Licensed, bonded and insured in Minnesota, #BC800584.

More house, or a better-arranged one?

Serving the Twin Cities
Serving the Twin Cities

Free Remodeling Estimate