Mon–Sat 7AM–6PM  ·  (612) 516-0263

Burnsville & the Twin Cities West Metro

Butkov Remodeling

Whole-Home Remodeling in Mound

Your house probably does not meet current setbacks. There is a permit for exactly that.
Finished basement living space in a Minnesota home

Mound was platted for summer cottages. Small lots, close to the water, laid out in the 1920s and 1930s for buildings nobody intended to live in through a winter.

The houses grew. The lots did not. The result is that a large share of Mound homes today sit closer to a property line than current zoning would allow for a new build — they are legally nonconforming, which sounds alarming and mostly is not.

What matters is that Mound has a defined path for expanding a nonconforming house, and it is not the same as applying for a variance. Knowing which one your project needs changes the timeline and the odds considerably, and it is the first thing we establish.

The Mound houses we remodel

The distinction is straightforward once someone explains it. If an expansion would push further into a setback than the house already does, that is a variance. If it would not — a second storey built above a first floor that is already too close to the line, for instance — that is an Expansion Permit, which is a different and generally more predictable process.

Below that sits a Minor Expansion Permit, which covers a defined set of smaller moves: roof modifications within the existing footprint, excavating a basement within the existing footprint, upper-floor additions under 500 square feet, and footprint additions under 250 square feet. A surprising number of Mound projects can be shaped to fit inside those limits, and doing so deliberately is often worth more than the extra square footage would have been.

The other governing number is hardcover. The standard limit is 30 percent, rising to 40 percent on an existing lot of record where the city’s stormwater conditions are satisfied. That counts the house, garage, driveway, patios and paths together, and on a cottage-era lot it is usually the binding constraint rather than the setbacks.

Mound also maintains a zoning district specifically for this situation, created because historic platting produced small lots that need relaxed standards for remodelling and infill. That is unusual and it works in your favour. The city’s own comprehensive plan acknowledges the flip side plainly: small original lots become a hurdle when owners want to tear a house down and build something much larger in its place.

Licensed • Bonded • Insured • Serving the Twin Cities

Butkov Remodeling — Your Home Deserves Better Than Average

Most Mound houses sit on lots platted for summer cottages, which means many do not meet current setbacks. There is a specific permit path for expanding them, and it is not a variance.

Get in Touch with Our Team

Whole-home remodeling throughout Mound

Mound, MN
City of Mound, Minnesota city hall
We remodel across Mound — Three Points, Island Park, Halstead Heights, Shadywood Point, The Highlands, Seton and the Lost Lake area — on lakeshore parcels fronting Cooks, Harrisons, Jennings, Black Lake and Seton bays, and on interior lots near Dutch Lake and Lake Langdon. The corridors are Shoreline Drive and Lynwood Boulevard (County Road 15), Commerce Boulevard and Bartlett Boulevard (County Road 110), Wilshire Boulevard, Westedge Boulevard and Three Points Boulevard. Lot sizes and setback obligations vary street by street here far more than in a conventionally platted suburb, so we pull your property record rather than working from the neighbourhood.

Common Questions

Our house sits closer to the lot line than the code allows. Can we still remodel it?+
Yes. A legally nonconforming structure is one that was lawful when built and no longer meets current standards, which describes a great many Mound houses because the lots were platted for cottages. It does not prevent you remodelling, and it does not prevent you expanding. What it does is determine which approval path your specific project takes, and that depends on whether the work pushes further into the setback than the house already does. We establish that from your property record before anything is designed.
What is an Expansion Permit, and when do we need one instead of a variance?+
The dividing line is whether the proposed work intrudes further into a required setback than the existing structure already does. If it does, you are asking the city to allow something beyond the current nonconformity, and that is a variance. If it does not — the clearest example being a second storey built directly above a first floor that is already too close to the line — that is an Expansion Permit. The practical difference is that the Expansion Permit route is more predictable and generally faster, which is why it is worth designing toward it deliberately.
What counts as a Minor Expansion Permit?+
It covers a defined set of smaller changes: roof modifications within the existing footprint, excavating a basement within the existing footprint, upper-floor additions under 500 square feet, and footprint additions under 250 square feet. Those thresholds are worth knowing early, because a design that lands just over one of them buys a longer and less certain approval process for a fairly small gain. We will show you where your plan sits relative to them and what it costs you to cross a line.
How much hardcover are we allowed?+
The standard limit is 30 percent of the lot, rising to 40 percent on an existing lot of record where the city's stormwater conditions are met. Hardcover counts the house, garage, driveway, patios, paths and similar surfaces together, and the city publishes a calculation form for working it out. On a small cottage-era lot this is normally the constraint that binds before the setbacks do, so we run the numbers at the start. Where a project is close to the line, adding pervious surfacing elsewhere on the site is sometimes what makes it work.
Can we add a second storey?+
Often, and on a small Mound lot it is frequently the only way to get meaningful additional space. Two things get checked first. Structurally, whether the existing foundation and wall framing can carry the load, which is an engineering question with a definite answer. Procedurally, whether building above a nonconforming first floor puts you on the Expansion Permit path, which it usually does, and whether the addition fits under the 500 square foot threshold for the minor route. Both get resolved before design rather than during it.
Should we remodel or tear down and rebuild?+
It is a fair question here and we will give you a straight answer rather than the one that suits us. Mound's own comprehensive plan notes that the original small-lot platting becomes a hurdle when owners want to demolish and build something much larger, because the new structure has to meet current setbacks and hardcover limits in full, while an expansion of the existing house can proceed under the nonconforming provisions. That asymmetry means remodelling often delivers more usable space on a Mound lot than rebuilding does. Not always — but often enough that it deserves checking before you commit to the wreckers.

Before design, before drawings, it is worth knowing whether your project is a variance, an Expansion Permit or a Minor Expansion Permit. The answer changes the timeline, the cost and the likelihood of getting a yes. We will work it out with you.

You get a written scope and a fixed price before demolition starts. Licensed, bonded and insured in Minnesota, #BC800584.

Find out which permit path you are on

Serving the Twin Cities
Serving the Twin Cities

Free Remodeling Estimate