Mon–Sat 7AM–6PM  ·  (612) 516-0263

Burnsville & the Twin Cities West Metro

Butkov Remodeling

Basement Finishing in Excelsior

The room is the easy part. The excavation is the project.

Excelsior is the densest city on this side of the lake, and in the village area the lots run to roughly 5,000 to 7,000 square feet near downtown. Houses sit close to their neighbours, side yards are narrow, and a fair number of properties have no route to the back garden wide enough for a machine.

None of that affects the finished basement. All of it affects the one item most lower-level projects depend on, which is cutting an egress window into the foundation.

So on an Excelsior job we work backwards. Establish whether and where an egress opening is achievable, then design the rooms around the answer — rather than designing a bedroom and discovering later that nothing can reach the wall it needs.

Open living space after a whole-home remodel

What basement finishing in Excelsior actually involves

An egress window is a foundation cut plus an excavation outside it, and on a village lot three things have to line up.

Physical access comes first. A mini excavator needs a way in. Where side yards are too narrow, the alternatives are hand excavation, which is slower and costs accordingly, or working from the front or a shared access with a neighbour’s agreement. None of this is exotic, and all of it wants establishing before the estimate rather than after.

Second, Excelsior’s grading thresholds are lower than most people expect. A permit is required for moving more than 10 cubic yards on steep slopes or within shore and bluff impact zones, and more than 50 cubic yards elsewhere. A window well excavation with spoil to remove can approach those figures, particularly on a property near the water.

Third, coverage. Excelsior’s impervious limits are set on a sliding scale by lot size — 42 percent on lots under 7,000 square feet, a formula in the middle band, and 27 percent above 14,000 — and a window well and any hard surfacing around it count toward it. On a small village lot with a house, a garage and a drive already in place, there is often less room in that budget than the yard suggests.

The compensation is that Excelsior is entirely served by municipal sewer and municipal water, so a lower-level bathroom here involves no septic capacity question and no well to size — which, on this side of the lake, is a genuine advantage.

Licensed • Bonded • Insured • Serving the Twin Cities

Butkov Remodeling — Your Home Deserves Better Than Average

In Excelsior the hard part of a basement is rarely the room. It is getting an egress window in — machine access on a village lot, grading thresholds and hardcover all at once.

Get in Touch with Our Team

Basement finishing throughout Excelsior

Excelsior, MN
Excelsior, Minnesota water tower with Lake Minnetonka beyond
We finish lower levels across Excelsior, in the village area west of downtown with its modified street grid and mature trees, along Water Street, Lake Street, George Street and Third Street, and in the newer curvilinear neighbourhoods south of Highway 7 and Oak Street where lots run larger. The city fronts Excelsior Bay and Gideon Bay with frontage on St. Albans Bay, and is bordered to the south by Galpin Lake. Main routes are Highway 7, Mill Street (County Road 82), Oak Street (County Road 19) and Excelsior Boulevard. Lot size varies sharply between the village and the south side, and it is the single biggest factor in what a basement project here involves.

Common Questions

Our side yard is too narrow for a machine. Can an egress window still be done?+
Usually, but the method changes and so does the price. Where there is no route for a mini excavator, the options are hand excavation, which is slower and more labour but entirely feasible for a single window well, or arranging access across a neighbouring property with their written agreement. We assess this on the first visit because it is the largest single variable in an Excelsior basement estimate and it is the one most likely to be glossed over by somebody quoting from a floor plan.
Do we need a grading permit just for a window well?+
Possibly, and Excelsior's thresholds are lower than most. A permit is required for moving more than 10 cubic yards on steep slopes or within shore and bluff impact zones, and more than 50 cubic yards elsewhere in the city. A single window well excavation with spoil removed can approach the lower figure on a property near the water. It is a straightforward permit rather than an obstacle, and we would rather include it in the schedule from the start than have the work paused.
Does a window well count toward our lot coverage?+
The well and any hard surfacing around it count toward impervious coverage, which in Excelsior is set on a sliding scale by lot size — 42 percent for lots under 7,000 square feet, a formula for lots between 7,000 and 14,000, and 27 percent above that. On a small village lot already carrying a house, a garage and a driveway, the remaining allowance can be tighter than it looks. We calculate the current position before proposing anything that adds surface.
What are the actual egress window requirements?+
Minnesota code requires a net clear opening of at least 5.7 square feet, a minimum opening width of 20 inches, and a sill no higher than 44 inches above the finished floor. Where the opening is below grade it also needs a window well of at least 9 square feet. Those are the numbers a bedroom has to meet. A basement finished as a family room, office or gym without a sleeping room does not require one, which is sometimes the right answer on a constrained lot.
What ceiling height do we need in an older Excelsior basement?+
Minnesota sets a specific standard for alterations to existing basements: 6 feet 4 inches including beams and ducts, rather than the 7 feet required for newly created habitable space, with the same figure applying to bathroom fixture clearances at defined points. In the older village houses this is worth measuring properly rather than assuming, because the difference between the two figures is frequently the difference between a usable lower level and a written-off one.
Is there a septic or well issue like other lake communities?+
No, and it is a real advantage here. Excelsior is served entirely by municipal sanitary sewer and by a city water system, so a lower-level bathroom involves no septic compliance inspection, no drainfield capacity question and no private well to size. Several neighbouring cities on this side of the lake have one or both of those constraints. In Excelsior the project is about the building and the site, not the utilities.

Before anything else, we want to see whether a machine can reach the wall your egress window needs. That one answer changes the budget more than any choice you will make about the room itself.

You get a written scope and a fixed price before demolition starts. Licensed, bonded and insured in Minnesota, #BC800584. Two-year workmanship warranty on basement projects against improper installation.

Let us look at the side yard first

Serving the Twin Cities
Serving the Twin Cities

Free Remodeling Estimate